Tymeline runs your chip program.

From spec to tape-out to samples to qual — every commitment held to the date, and trouble cleared while it is still small, before it can reach tape-out.

SoC-7 · floorplantape-out Mar 14
CPU DDR5 SerDes USB4 PMU Analog DFT Memory +4 wks

Reading sign-off from the tools…

One missed hand-off. One re-spin. A quarter gone.

Most slips aren't engineering failures. They're a coverage curve that flattened three weeks ago, an IP vendor's email nobody connected to RTL freeze, firmware still planned against the old silicon date.

  • 14%

    first-silicon success, a 20-year low

    Siemens / Wilson Research 2024

  • ~75%

    of chip projects late

    Same study

  • $5–30M

    for a mask set at 7nm–3nm, plus 3–6 months of the whole team

    Industry consensus, multiple foundry data

Your engineers stay on the silicon. Tymeline holds the program to its date.

The record

Every milestone — RTL freeze, coverage closure, timing closure, tape-out, samples, qual — with an owner and a date, read from Perforce, your EDA tools, Jira and the foundry's own emails.

The alarm

When the coverage slope no longer reaches the date, when an ECO lands late, when the IP vendor or the foundry moves — the owners know that hour, with the downstream chain and the fix, while there is still slack to use.

The hands

AI Employees work out the recovery, line up the people and the runs, re-sequence the plan and draft the escalation. You approve; they carry it out. No AI Employee approves a tape-out gate. Ever. That is policy, enforced at runtime.

The memory

Every baseline and re-baseline kept with a named approver. The next program starts knowing what slipped on this one and what fixed it.

The rituals you trust are the rituals that govern.

Stand-ups, design reviews, bug triage, change boards and tape-out gates stay exactly as they are. The packet is assembled before anyone arrives. The decision stays human.

“Engineers don't have to learn a new way to work. The AI Employee learns yours.”

How Tymeline fits a design team

Every silicon team. One record.

Ten teams. Ten AI Employees. Forty-plus pre-built patterns, RTL to post-silicon.

  • AriaRTL design
  • VelaVerification
  • DaxDFT
  • PhinPhysical design
  • AnaAnalog & mixed-signal
  • SoraIntegration & firmware
  • MiraVIP & methodology
  • PaxPackaging
  • PosiPost-silicon
  • OrinProgram operations

Your RTL never leaves. Neither does the decision record.

Tymeline works on program signals — tickets, regression results, timing reports, milestones, messages — not on design files. Every action is signed and exportable to your SIEM. For advanced-node and ITAR floors, Patrick runs the entire platform inside your walls.

Your tape-out is the date. See Tymeline hold it.

45 minutes. No slide deck.

Independently attested. Renewed annually.